Battery current regulation
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Mar 6, 2018
Grant Date -
Jun 5, 2014
app pub date -
Nov 30, 2012
filing date -
Nov 30, 2012
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
Embodiments are directed to an engine of an aircraft, a starter generator configured to receive power to cause the engine to start and to provide electrical power to at least one load, and a battery system comprising: a battery, and at least one of a controller and a regulator configured to limit an in-rush current to the battery following the starting of the engine.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
SIKORSKY AIRCRAFT CORPORATION | 6900 MAIN STREET STRATFORD CT 06615 |
International Classification(s)

- 2012 Application Filing Year
- H02J Class
- 3166 Applications Filed
- 2735 Patents Issued To-Date
- 86.39 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Bourne, Frederick L | Litchfield, US | 13 | 74 |
# of filed Patents : 13 Total Citations : 74 | |||
Eisenhauer, Mark P | Milford, US | 13 | 113 |
# of filed Patents : 13 Total Citations : 113 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H02J Class
- 0 % this patent is cited more than
- 7 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Sep 6, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Sep 6, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Matter Detail

Renewals Detail
