Variable geometries fluid supply circuit for a turbomachine without volumetric pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9909498
APP PUB NO 20170051671A1
SERIAL NO

15306936

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for supplying a turbomachine with fluid, the supply system including a low-pressure pumping unit intended to increase the pressure of the fluid flowing toward a downstream circuit. The downstream circuit divides at an inlet node, situated between the low-pressure pumping unit and the high-pressure volumetric pump, into a circuit supplying an injection system and a variable geometries supply circuit. The circuit supplying the injection system includes a high-pressure volumetric pump. The variable geometries supply circuit is configured to convey the fluid toward variable geometry from the inlet node to an outlet node connecting the variable geometries supply circuit to the upstream circuit between two pumps of the low-pressure pumping unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN AIRCRAFT ENGINES2 BOULEVARD DU GÉNÉRAL MARTIAL VALIN PARIS 75015

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chalaud, Sebastien Moissy-Cramayel, FR 8 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00