Assembly having a gas turbine engine and a preheating arrangement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9909493
APP PUB NO 20160003141A1
SERIAL NO

14767304

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An assembly includes a gas turbine and a heat exchanger for heating up a gas turbine process fluid by thermal energy. The gas turbine has a compressor, a combustor and a turbine downstream of the combustor, wherein the thermal energy is from the solar receiver. To improve efficiency and reduce power generation fluctuations, the assembly includes a first line to conduct the gas turbine process fluid downstream a compression by the compressor to the heat exchanger, and a second line to conduct the gas turbine process fluid from the heat exchanger to the combustor to generate hot combustion gas from the warmed up gas turbine process fluid burning fuel in the combustor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS ENERGY GLOBAL GMBH & CO KGOTTO-HAHN-RING 6 MUNICH 81739

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andersson, Mats Norrkoping, SE 74 509
Janczewski, Jacek Norrkoping, SE 1 2
Lindman, Olle Finspang, SE 5 8
Persson, Magnus Svartinge, SE 87 1481

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00