Protective element, concrete element, and method for producing a concrete element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9909418
SERIAL NO

15183578

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a protective element (20) for connecting to a concrete element (10) of a tunnel lining, to the concrete element (10) and to the method for producing the concrete element (10). It is an object of the invention to provide a protective element (20) for a tunnel lining, or the associated concrete element, which ensures that the protective casing of the tunnel lining is better safeguarded against corrosive gases or liquids. The solution of the invention provides that the protective element (20) is produced from an injection-moldable plastics material, that a protective portion (21, 22, 23) is connected in a single piece to a seal (30), wherein the connection is gas-tight and liquid-tight, that the protective portion (21, 22, 23) is connected in a single piece to a connecting element (24, 25, 26, 27, 28), and that the single-piece connection is produced by injection molding of the plastics material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HERRENKNECHT AGSCHLEHENWEG 2 SCHWANAU 77963

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Peters, Marc Freiberg, DE 9 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00