Assembly for producing a threaded connection, method for making up and breaking out said connection and use of said connection in a work over riser

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9909371
SERIAL NO

13511197

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An assembly for producing a threaded connection, including first and second tubular components with an axis of revolution, each including at one end a male threaded zone produced on the external circumferential surface, the ends each finishing in a terminal surface forming a direct drive dog clutch device to fix the first and second tubular components in rotation, and including a third tubular component which also has an axis of revolution and includes at each end on its internal circumferential surface two female threaded zones, one of the two male threaded zones being capable of cooperating with one of the two female threaded zones while the other male threaded zone can co-operate with the other female threaded zone. The male end of the first tubular component and the corresponding female end of the third tubular component include a mechanism for free rotation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Coeffe, Guillaume Paris, FR 5 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00