Mechanical linkage for control of power machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9909280
APP PUB NO 20160122978A1
SERIAL NO

14926166

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mechanical linkage for a power machine includes first and second horizontal shafts extending sideways along respective first and second axes. First and second links are operably coupled to the respective first and second horizontal shafts. The links convert actuation of operator input devices of the power machine into rotation of the horizontal shafts about their axes. First and second valve actuators convert rotation of the respective first and second horizontal shafts into actuation of respective first and second spools in a hydraulic valve of the power machine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CLARK EQUIPMENT COMPANY250 EAST BEATON DRIVE WEST FARGO ND 58078

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fi{hacek, over (s)}er Jaroslav P{hacek over (ŕ)}{hacek over (i)}bram, CZ 1 0
Kratochvíl, Petr P{hacek over (ŕ)}{hacek over (i)}bram, CZ 1 3
Matú{hacek, over (s)}{dot over (u)} Jakub Odry, CZ 1 0
Van{hacek, over (e)}k Karel Mn{acute over ({hacek over (i)}s)}ek pod Brdy, CZ 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00