Process for manufacturing press-hardened coated steel parts and precoated sheets allowing these parts to be manufactured

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9909194
SERIAL NO

14426523

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cold-rolled sheet is provided. The cold-rolled sheet is annealed and pre-coated for the fabrication of press hardened parts, composed of a steel substrate for heat treatment with a carbon content C0 between 0.07% and 0.5%, expressed by weight, and a metal pre-coating on at least the two principal faces of the steel substrate. The substrate comprises a decarburized area on the surface of each of the two principal faces. The depth p50% of the decarburized area is between 6 and 30 micrometers, and p50% is the depth at which the carbon content is equal to 50% of the content C0. The sheet does not contain a layer of iron oxide between the substrate and the metal pre-coating. Processes are also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARCELORMITTAL INVESTIGACION Y DESARROLLO S LSESTAO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Drillet, Pascal Rozerieulles, FR 34 236
Puerta, Velasquez Juan David Metz, FR 5 55
Staudte, Jonas Montigny-les-Metz, FR 8 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00