Blends of polyetherimide sulfone and poly(arylene sulfide)

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9909006
SERIAL NO

13246586

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein is a composition comprising a compatible blend of i) 60 to 85 weight percent of a linear poly(arylene sulfide), ii) 15 to 40 weight percent of a polyetherimide sulfone; and iii) 1 to 3 weight percent of a novolac resin having an average of 2 or more epoxy groups per molecule. Weight percent is based on the total weight of the composition. An article made from the composition has a tensile strength greater than or equal to 70 megaPascals (MPa), as determined by ASTM D638, an impact strength of greater than or equal to 3 kiloJoules per square meter (kJ/m2), as determined by ASTM D256, and an elongation at break greater than or equal to 3 % as determined by ASTM D638. Methods of making the composition are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHPP GLOBAL TECHNOLOGIES B V4612 PX BERGEN OP ZOOM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chatterjee, Gautam Bangalore, IN 26 215
Haralur, Gurulingamurthy M Evansville, US 20 158
Mishra, Sanjay Braj Evansville, US 10 174
Ramalingam, Hariharan Bangalore, IN 24 96
Sheth, Kapil Chandrakant Evansville, US 34 328
Sreeramagiri, Siva Kumar Bangalore, IN 7 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00