Removal of aldehydes in acetic acid production processes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9908833
SERIAL NO

15368202

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present technology discloses processes for producing carboxylic acid. In some embodiments, the processes include contacting methanol and carbon monoxide in the presence of a liquid reaction medium under carbonylation conditions sufficient to form a carbonylation product, including acetic acid and acetaldehyde. The liquid reaction medium may include a carbonylation catalyst selected from rhodium catalysts, iridium catalysts and palladium catalysts; and water in a water concentration in a range of 1 wt. % to 14 wt. % based on the total weight of the liquid reaction medium. In certain embodiments, the processes comprise contacting at least a portion of the carbonylation product or a derivative thereof with a micro-porous material such as a silicoaluminophosphate (SAPO) to selectively convert at least a portion of the acetaldehyde to crotonaldehyde.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LYONDELLBASELL ACETYLS LLC1221 MCKINNEY STREET SUITE 300 HOUSTON TX 77010

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hallinan, Noel C Loveland, US 46 100
Ramage, David L Friendswood, US 30 42
White, Daniel F Houston, US 86 779

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00