Device and a method for transferring advancing yarn during bobbin changeover in an automatic turret type yarn winder

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9908740
SERIAL NO

15115907

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is a part of a yarn transfer system used for transferring yarn from a full bobbin to an empty bobbin typically fitted on a winder frame. The invention broadly comprises a yarn traverse device used in transferring a continuously arriving yarn onto an empty bobbin for commencing of winding process during bobbin changeover process in automatic turret winder without any stoppage. This is achieved with the provision of an actuation device that facilitates axial movement of the yarn traverse device. In the present invention, during the bobbin changeover operation, the yarn traverse device is moved axially through the actuation device and allows the traverse guide—while maintaining its normal traverse speed at all times—to move beyond the normal yarn winding zone such that the advancing yarn is within the reach of the yarn grasping device of the ready-to-be-wound empty bobbin. After the yarn transfer is completed, the traverse device moves back to the normal winding zone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LOHIA AMIT KUMARKAMPUR 208 022

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lohia, Amit Kumar Kanpur, IN 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00