Control device of hybrid vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9908522
SERIAL NO

15060093

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device of a vehicle enables an engine to be operated at an operating point with a good fuel consumption efficiency, to perform power generation, without causing a sense of incongruity about noise or vibrations to a driver. With the control device, the engine is operated so that generated power of a generator increases in response to electric power required of the vehicle. Thus, the engine can be operated at an operating point with a satisfactory fuel consumption efficiency. When in an acceleration state, the engine is operated so that the increase amount of generated power is set to be larger than when in a deceleration state. When in the deceleration state, the engine is operated so that an increase in generated power is suppressed and an increase in noise is curbed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI JIDOSHA KOGYO KABUSHIKI KAISHA33-8 SHIBA 5-CHOME MINATO-KU TOKYO 108-8410

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirano, Shigetoshi Toyoake, JP 15 69
Hirao, Tadayoshi Okazaki, JP 8 59
Ikedaya, Hisakazu Okazaki, JP 11 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00