Torsion output tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9908232
SERIAL NO

14750230

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A torsion output tool has a housing, a motor and a transmission assembly. The transmission assembly includes a first planetary gear train. The first planetary gear train has a first planetary gear carrier, a first level planetary gear, a first inner ring gear disposed outside the first level planetary gear and meshing therewith, and a first central wheel sliding in a direction of a first axis to a first position and a second position. The transmission assembly further has a locking member. The locking member slides synchronously with the first central wheel and only locks the relative circumferential positions of the output shaft and the first planetary gear carrier when the first central wheel is at the first position and only constitutes circumferential engagement with the first planetary gear carrier when the first central wheel is at the second position to achieve a drilling mode and an impact mode of operation for the tool.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHERVON (HK) LIMITED138 GLOUCESTER ROAD ROOM 803B 8/F ALLIED KAJIMA BUILDING WANCHAI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Cuihua Nanjing, CN 6 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00