Systems for two-stage biomass pyrolysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9908092
SERIAL NO

15436029

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates generally to two-stage biomass pyrolysis systems configured to maximize pyrolysis vapor yield from a lignocellulosic biomass while being conducive to commercial-scale throughput of lignocellulosic biomass. The system includes a reactor first stage comprising at least one auger pyrolyzes a lignocellulosic feedstock at a temperature and residence time that produces pyrolysis vapors derived predominantly from cellulose and hemi-cellulose fractions of the feedstock. A reactor second stage is configured to partially-pyrolyzed feedstock from the reactor first stage at a higher temperature for an additional residence time to produce additional pyrolysis vapors that are predominantly derived from of lignin. Certain embodiments arrange multiple reactor first stages around a single reactor second stage.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PHILLIPS 66 COMPANY3010 BRIARPARK DRIVE PWC 8216 HOUSTON TX 77042

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dalluge, Dustin L Bartlesville, US 3 9
Gorke, Johnathan T Houston, US 11 51
Jones, Samuel T Dewey, US 16 66
Lusk, Steven E Ponca City, US 19 78

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • B01J Class
  • 0 % this patent is cited more than
  • 7 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges4698634915101 - 1011 - 2021 - 3071 - 80050100150200250300350400450500550600650700750800850900950

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029