Process for removing heavy metals from process streams

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9908084
APP PUB NO 20150182911A1
SERIAL NO

14414959

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for removing heavy metals from process fluids includes passing a heavy-metal-containing process fluid, including a reductant selected from hydrogen and carbon monoxide, at an inlet temperature ≦125° C. over a sorbent including

    (i) 4-75% by weight of one or more sulphided copper compounds selected from sulphided basic copper carbonate, sulphided copper hydroxide, sulphided copper oxide or mixtures of these,(ii) optionally a support material, and(iii) a binder and the binder content of the sorbent is in the range 5-30% by weight,wherein essentially all of the sulphided copper is in the form of CuS and the total metal sulphide content of the sorbent, other than copper sulphide, is ≦5% wt.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JOHNSON MATTHEY PUBLIC LIMITED COMPANY5TH FLOOR 25 FARRINGDON STREET LONDON EC4A 4AB

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fish, Andrew Cleveland, GB 11 195
Foster, Andrea Lara County Durham, GB 1 5
Lunn, Matthew David Gwydion County Durham, GB 10 11
Mansfield, Rachel Billingham, GB 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00