PCB with two rows of solder pads including both SMT-based and DIP-based structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9907187
SERIAL NO

15657254

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A PCB with two rows of solder pads including both SMT-based and DIP-based structures is configured to be mounted with a USB Type-C connector by soldering, has two rows of solder pads on its top side, and is characterized in that at least one solder pad in one of the rows is a DIP-based structure while the remaining solder pads in the same row are SMT-based structures, and that all the solder pads in each row that are used to transmit high-frequency signals are SMT-based structures. Once the connector is mounted to the PCB, an inspector can directly examine the soldering quality of the DIP-based-structure solder pad and of the corresponding connection terminal simply by inspecting the bottom side of the PCB. Moreover, since all the solder pads configured for transmitting high-frequency signals are SMT-based structures, better transmission will be provided to the connector, accordingly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIMULA TECHNOLOGY INC14F NO 1351 ZHONGZHENG RD TAOYUAN DIST TAOYUAN CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tseng, Te-Chih Taoyuan, TW 7 88

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00