Manufacturing method for a power supply module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9907184
SERIAL NO

14845631

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply module and its manufacturing method are disclosed. The manufacturing method for the power supply module includes: configuring a coil such that coil terminals are configured by way of electrical connection in the preset circuit connection configuration of the connector; preparing a mold cavity, and placing the connector housed with the coil and the electronic components into the mold cavity; making a magnetic mixture, and filling the mold cavity where the connector is placed with the magnetic mixture to form a magnetic body under pressure, wherein the magnetic body encapsulates at least the coil, the electronic components and a portion of the connector adapted to house the coil and the electronic components, and the terminal is exposed outside the magnetic body; demolding the magnetic body from the mold cavity; and increasing the temperature of the demolded magnetic body by heating. In this way, the molding pressure for forming the power supply module is lower and the manufactured power supply module has good performance of heat transfer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMIDA ELECTRIC (H K ) COMPANY LIMITED2201-3 DCH COMMERCIAL CENTRE 25 WESTLANDS ROAD QUARRY BAY HONG KONG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Yanfei Kingston, CA 24 82
Malcolm, Douglas James Algonquin, US 16 60
Zhang, Hongnian Hong Kong, CN 3 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00