System and method for determining nonlinear mitigation perturbative distortion coefficients using a received optical signal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9906309
SERIAL NO

14675187

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A processor circuit is provided in a coherent optical receiver module. The processor receives a series of electrical signals over a time period, representative of a series of optical signals received at instants of time within the time period. Each of the electrical signals is indicative of a respective one of a plurality of points on an IQ plane, each of the points being spaced from one of a plurality of predetermined points in the IQ plane by a corresponding one of a plurality of distortion values. In addition, the processor circuit calculates one or more perturbative coefficients based on one or more of the distortion values and determines data from the series of electrical signals based on the perturbative coefficient.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INFINERA CORP6373 SAN IGNACIO AVE SAN JOSE CA 95119

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Awadalla, Ahmed Gatineau, CA 14 179
Karar, Abdullah Kingston, CA 4 114
Mertz, Pierre Hervé Baltimore, US 1 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00