Semiconductor device, manufacturing method of the same, and mobile phone

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9906205
SERIAL NO

15041368

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A technique capable of maintaining the filter characteristics of a transmitting filter and a receiving filter by reducing the influences of heat from the power amplifier given to the transmitting filter and the receiving filter as small as possible in the case where the transmitting filter and the receiving filter are formed on the same semiconductor substrate together with the power amplifier in a mobile communication equipment typified by a mobile phone is provided. A high heat conductivity film HCF is provided on a passivation film PAS over the entire area of a semiconductor substrate 1S including an area AR1 on which an LDMOSFET is formed and an area AR2 on which a thin-film piezoelectric bulk wave resonator BAW is formed. The heat mainly generated in the LDMOSFET is efficiently dissipated in all directions by the high heat conductivity film HCF formed on the surface of the semiconductor substrate 1S.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RENESAS ELECTRONICS CORPORATIONTOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asai, Kengo Tokyo, JP 43 570
Isobe, Atsushi Tokyo, JP 55 1008

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00