Resonant switched-capacitor gyrator-type converter with local MPPT capability for PV cells

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9906189
SERIAL NO

14419592

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for increasing the power extraction capability out of Differential Power Processor (DPP) system, which consists of a chain of N serially connected PV elements and an array of N−1 gyrator-type converters which are current sourcing resonant Switched Capacitor Converters (SCCs), each of which being connected in parallel with two adjacent PV elements. Accordingly, local MPPT is continuously performed, by each gyrator-type converter, to one of its two connected PV elements by sinking or sourcing current to/from the neighboring PV element. Whenever a mismatch in the MPPs is detected, the gyrator-type converters are used to provide the difference in current that is required for each of the PV elements to operate at its MPP, such that the amount of power processed by each gyrator-type converter in the chain is linearly proportional to its location in the chain, with respect to the mismatched PV element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BEN-GURION UNIVERSITY OF THE NEGEV RESEARCH & DEVELOPMENT AUTHORITY84105 BEER SHEVA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ben-Yaakov, Shmuel Beer Sheva, IL 14 507
Blumenfeld, Alon Ashkelon, IL 3 18
Cervera, Alon Beer Sheva, IL 5 24
Peretz, Mor Mordechai Lehavim, IL 12 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00