Three-phase switched reluctance motor torque ripple two-level suppression method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9906182
APP PUB NO 20170222590A1
SERIAL NO

15308818

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A three-phase switched reluctance motor torque ripple two-level suppression method. A first set of torque thresholds at rotor position interval [0°, θr/3]. A second set of torque thresholds at rotor position interval [θr/3, θr/2]. Power is supplied for excitation. The power supplied for excitation to phase A leads the power supplied for excitation to phase B by θr/3. Phase A is turned off, while phase B is turned on. An entire commutation process from phase A to phase B is divided. In rotor position interval [0°, θ1], phase A uses the second set of torque thresholds while phase B uses the first set. Critical position θ1 automatically appears in the commutation process. Total torque is controlled. In rotor position interval [θ1, θr/3], phase A uses the second set of torque thresholds, phase B uses the first set, and the total torque is controlled, suppressing torque ripples of a three-phase switched reluctance motor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA UNIVERSITY OF MINING AND TECHNOLOGY221116 NO 1 TONGSHAN UNIVERSITY ROAD XUZHOU CITY JIANGSU PROVINCE XUZHOU CITY JIANGSU PROVINCE 221116

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Hao Jiangsu, CN 1012 6150
Shi, Jiaotong Jiangsu, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00