Method of starting a three-phase BLDC motor and motor driver using same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9906175
SERIAL NO

15276887

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method of starting a three-phase sinusoidal BLDC motor, comprising: a) determining an initial position of the rotor; b) applying a first set of sinusoidal energizing signals to the windings, corresponding to a set of sinusoidal waveforms shifted apart by 120° and 240° sampled at a first angle (Φ1); and maintaining the energizing signals for allowing the rotor to move to a first angular position; c) while maintaining the energizing signals, monitoring two of the phase currents, and determining whether a predefined condition is satisfied, comprising testing whether a ratio of two total current values is equal to a predefined value, and if true, to repeat steps b) and c), but with second and further sinusoidal energizing signals sampled at a second or further angular position, selected from a limited group of discrete angular positions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MELEXIS TECHNOLOGIES NVTRANSPORTSTRAAT 1 POORT WEST-LIMBURG 1371-1372 TESSENDERLO 3980

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Esvelt, Michaël Bernardus Petrus Arnhem, NL 1 0
Filusch, Robert Erfurt, DE 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00