Power converting apparatus, control device, and method for controlling power converting apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9906168
SERIAL NO

14696485

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power converting apparatus is provided. The power converting apparatus includes a power converter configured to output a voltage to a load, and a controller configured to output a PWM signal which is generated in response to a voltage command to the power converter. The power converter includes a plurality of switching elements driven based on the PWM signal. The controller is configured to generate the PWM signal such that a first period during which a zero voltage is outputted and a second period during which a non-zero voltage is outputted are adjusted according to the voltage command. The controller is allowed to output the PWM signal which is set such that one first period and one or more second periods exist within an updating cycle of the voltage command, to the power converter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA YASKAWA DENKIFUKUOKA PREFECTURE FUKUOKA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Katayama, Taisuke Fukuoka, JP 9 24
Takagi, Hiroshi Fukuoka, JP 188 2040

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00