Electronic device and over-current protection circuit thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9906011
SERIAL NO

14715229

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An over-current protection circuit includes a first connector, a first current measuring unit, a first switch unit, a first resistor unit, and a second connector. The first connector is electrically coupled to a power supply unit (PSU). When a current of the first resistor unit measured by the first current measuring unit is less than a first reference value, the first switch unit is turned on, and the second connector receives a first power supply from the PSU. When the current of the first resistor unit measured by the first current measuring unit is greater than or equal to the first reference value, the first switch unit is turned off, and the second connector does not receive the first power supply from the PSU.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCIENBIZIP CONSULTING(SHENZHEN)CO LTD11F RONGQUN BUILDING NO 83 LONGGUAN EAST RD LONGHUA NEW DIST SHENZHEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ku, Sung-Kuo New Taipei, TW 3 1
Wei, Ming-Tao Wuhan, CN 1 0
Xu, Qi-Sheng Wuhan, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00