Permeable metal substrate, metal-supported solid oxide fuel cell and their manufacturing methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9905873
SERIAL NO

15214701

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a permeable metal substrate and its manufacturing method. The permeable metal substrate includes a substrate body and a permeable powder layer. The permeable powder layer is located on the top of the substrate body. The substrate body can be a thick substrate or formed of a thick substrate and a thin substrate that are welded together. Both the thick and thin substrates have a plurality of permeable straight gas channels. In addition, a metal-supported solid oxide fuel cell and its manufacturing method are also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INSTITUTE OF NUCLEAR ENERGY RESEARCH ATOMIC ENERGY COUNCIL EXECUTIVE YUAN R O CNO 1000 WENHUA RD JIAAN VILLAGE LONGTAN DISTRICT TAOYUAN CITY 32546

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Chun-Liang Taoyuan, TW 14 37
Chuang, Shie Zong-Yang Taoyuan, TW 4 4
Huang, Te-Jung Taoyuan, TW 5 6
Hwang, Chang-Sing Taoyuan, TW 19 64
Lin, Jing-Kai Taoyuan, TW 4 5
Tsai, Chun-Huang Taoyuan, TW 21 65
Wu, Ming-Hsiu Taoyuan, TW 17 67
Yang, Sheng-Fu Taoyuan, TW 15 76

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00