Process for preparing an ion-exchange composite material comprising a specific polymer matrix and a filler consisting of ion-exchange particles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9905872
SERIAL NO

14785005

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process for preparing a composite material comprising a fluorinated polymeric matrix and a filler consisting in ion exchange inorganic particles comprising a step for in situ synthesis of said particles within the polymeric matrix, said matrix comprising at least one first copolymer comprising at least two types of fluorinated recurrent units, a type of which bears at least one pendant maleic anhydride group.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARKEMA FRANCECOLOGNE FRANCE COLOMBE HAUTS-DE-SEINE
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVESPARIS FRANCE PARIS PARIS
INSTITUT NATIONAL DES SCIENCES APPLIQUEESF-69100 VILLEURBANNE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bigarre, Janick Tours, FR 8 14
Blondel, Benoît Chambray-les-Tours, FR 1 0
Bounor, Legare Véronique Lyons, FR 2 0
Buvat, Pierrick Monts, FR 33 54
Chauveau, Jérôme Landepereuse, FR 6 4
Gerard, Jean-François Bron, FR 6 5
Seck, Sérigne Schiltigheim, FR 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00