Compact semiconductor package and related methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9905537
SERIAL NO

15360073

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a semiconductor package includes providing a substrate having one or more conductive elements disposed therein. Each conductive element extends from a first surface of the substrate toward a second surface of the substrate extending beyond the second surface. The second surface comprises one or more substrate regions not occupied by a conductive element. A first die is attached within a substrate region, and the first die is coupled to at least one of the conductive elements. The first die may be coupled to at least one of the conductive elements by a wire bond connection. Alternatively, an RDL is formed over the second surface, and the first die is coupled to at least one conductive element through the RDL. A second die may be attached to an outer surface of the RDL, and the second die is electrically coupled to the first die through the RDL.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INVENSAS CORPORATION2702 ORCHARD PARKWAY SAN JOSE CA 95134

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Uzoh, Cyprian Emeka San Jose, US 382 12692

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00