Method of generating an inclusion list for targeted mass spectrometric analysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9905405
SERIAL NO

15431618

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of generating an inclusion list for targeted mass spectrometric analysis is disclosed. Experimentally-acquired data for a plurality of isobarically-labeled peptides of interest is received at a computer. The data includes, for each of the isobarically-labeled peptides, a mass-to-charge (m/z) ratio, a charge state, and a chromatographic retention time. Predicted properties for a corresponding unlabeled peptide are determined via the computer. The predicted properties include a predicted m/z, a predicted charge state, and a predicted chromatographic retention time. The predicted properties for each corresponding unlabeled peptide are stored to the inclusion list. The predicted chromatographic retention time for the corresponding unlabeled peptide is determined based on hydrophobicity indices of the isobarically-labeled peptide and the corresponding unlabeled peptide, and chromatographic conditions for the targeted mass spectrometric analysis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THERMO FINNIGAN LLC355 RIVER OAKS PARKWAY SAN JOSE CA 95134

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blank, Michael A San Jose, US 6 8
Viner, Roza I Fremont, US 3 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00