Cooling mechanism for high-brightness X-ray tube using phase change heat exchange

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9905390
SERIAL NO

14888690

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mechanism for cooling the anode of an x-ray tube using a phase change material to transfer heat away from the anode. The x-ray tube is joined to a sealed heat exchange chamber which contains a liquid metal as a liquid to vapor phase change material (L-V PCM). The back side of the anode is exposed to an interior of the heat exchange chamber, and a jet sprayer inside the heat exchange chamber sprays a liquid of the metal onto the back side of the heated anode. The L-C PCM evaporates on that surface to carry away the heat, and the vapor then condenses back into the liquid on the cool surfaces of the heat exchange chamber. The surfaces of the heat exchange chamber may be cooled by convection cooling. Optionally, pipes containing a circulating cooling fluid may be provide inside the heat exchange chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NINGBO GALAXY MATERIALS TECHNOLOGY CO LTDNINGBO NATIONAL HIGH-TECH ZONE 2660 YONGJIANG BLVD NEW MATERIALS BLDG A1 NO 1004 NINGBO ZHEJIANG NINGBO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Xiang, Xiaodong Danville, US 35 1301

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00