Method for operating a pressurized water reactor during load monitoring

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9905321
SERIAL NO

14005065

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for controlling a pressurized water reactor (100) comprising the steps that involve measuring the effective power (Pe) of the nuclear reactor; acquiring a reference value for the desired power (Pc); acquiring an estimated duration (DURATION) for the increase in power in order to achieve said reference value of the target power (Pc) desired, said estimated duration (DURATION) corresponding to the time taken for the power to increase from said effective power (Pe) to said reference value for the target power (Pc); determining the reference position (Z) of at least one control rod cluster among said plurality of control rod clusters (40) in order to achieve said reference value for said target power (Pc) desired as a function of said estimated duration (DURATION), of said measured effective power (Pe) and of said reference value for said target power (Pc); monitoring the position of said at least one control rod cluster so as to position it in its reference position (Z).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AREVA NPKOLB WATT FRANCE COURBEVOIE HAUTS-DE-SEINE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grossetete, Alain Nanterre, FR 6 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00