Method for manufacturing optical information recording medium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9905260
SERIAL NO

14836359

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method for manufacturing an optical information recording medium includes: preparing a substrate material where a first guide groove has been formed on a first side of the substrate material; forming a second guide groove by applying an energy-curable resin material between a second side of the substrate material opposite to the first side and a stamper and subsequently curing the energy-curable resin material to form a substrate; providing at least one recording layer and a cover layer on a first side of the substrate where the first guide groove has been formed, while holding the substrate with the stamper left unremoved from the substrate to protect the second guide groove; and exposing the second guide groove by removing the stamper and providing at least one recording layer and a cover layer on a second side of the substrate where the second guide groove has been formed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJIFILM CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mikami, Tatsuo Odawara, JP 53 511

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00