Bridge with pickup for hybrid arched top guitar or the like

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9905212
SERIAL NO

15489250

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An arched top bridge upper section including a wood top section slotted to accept a string saddle that may be plastic, bone or similar material. The wood section is laminated or affixed to a lower metal section. A slot completely through the wood section exposes a top flat surface of the metal section. A piezo pickup element installed in the slot below a solid or segmented string saddle element is pressed uniformly against the metal section by string pressure on the string saddle to ensure even response on all strings. Transfer of string energy is more efficient than standard all-wood construction, resulting in greater sustain of plucked notes and a broader frequency response. An arch top guitar utilizing this bridge construction has more similar tonal and sustain characteristics to a typical flattop acoustic guitar while consistent contact with the piezo element results in even string-to-string output and response.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KORG U S A INC316 SOUTH SERVICE ROAD MELVILLE NY US 11747

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kirkland, William Eric Lenoir, US 5 31
McDonald, Robert Douglas Petaluma, US 5 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00