Method and system for correcting aero-optical thermal radiation noise

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9904987
SERIAL NO

15126271

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention discloses a method for correcting aero-optical thermal radiation noise, comprising steps of: pretreating a degraded image to obtain a multi-scale degraded image group, conducting iteration process of obtaining an optimal solution by using a last scale estimation result as an original value of next scale estimation according to the multi-scale degraded image group, thereby facilitating original-scale bias field estimation, and restoring the degraded image according to the original-scale bias field estimated value thereby obtaining an image after aero-optical thermal radiation noise correction. The invention also discloses a system for correcting aero-optical thermal radiation noise. The invention is capable of solving problems with conventional methods, comprising poor correction effect, high complexity, and incapability in correcting the thermal radiation noise at an image level, and applicable to restoration of an image with aero-optical thermal radiation noise.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUAZHONG UNIVERSITY OF SCIENCE AND TECHNOLOGY430074 HUBEI PROVINCE WUHAN CITY HONGSHAN DISTRICT LUOYU ROAD NO 1037 WUHAN CITY HUBEI PROVINCE 430074

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gao, Changxin Hubei, CN 5 18
Li, Lerenhan Hubei, CN 3 15
Peng, Juncai Hubei, CN 12 18
Sang, Nong Hubei, CN 11 38
Shao, Yuanjie Hubei, CN 4 18
Wang, Jin Hubei, CN 805 11628
Yan, Luxin Hubei, CN 4 17
Zhang, Shiwei Hubei, CN 15 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00