Apparatus and method for demand coordination network control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9904269
SERIAL NO

14674057

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus including devices, a network operations center (NOC), and control nodes. Each of the devices consumes a portion of a resource when turned on, and performs a corresponding function within an acceptable operational margin by cycling on and off. The NOC is disposed external to a facility, and determines an energy lag for the facility based upon fine-grained energy consumption baseline data. The NOC employs the energy lag to generate a plurality of run time schedules that coordinates run times for the each of the devices to control the peak demand of the resource. Each of the plurality of control nodes is coupled to a corresponding one of the plurality of devices. The plurality of control nodes transmits sensor data and device status to the NOC via the demand coordination network for generation of the plurality of run time schedules, and executes selected ones of the run time schedules to cycle the plurality of devices on and off.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENEL X NORTH AMERICA INCONE MARINA PARK DRIVE SUITE 400 BOSTON MA 02210

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Mohssen, Husain Dedham, US 59 657
Bassa, Angela S Stoneham, US 50 581
Paradis, Richard R Franklin, US 30 396
Willig, Randy C Fort Collins, US 34 909

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00