Display panel and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9904125
SERIAL NO

14750177

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A display panel includes a substrate, a plurality of thin film transistors (TFTs), a plurality common electrodes, a plurality of common electrode lines, a plurality of coupling electrodes, and a plurality of pixel electrodes. Each of the TFTs comprises a gate, a source, a drain and a channel layer coupling the source to the drain. The gate, the common electrodes, and the common electrode lines are formed on a surface of the substrate and are separated from each other. Each of the coupling electrodes couples a corresponding common electrode to a corresponding common electrode line, and a space is defined between the corresponding common electrode and the corresponding common electrode line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENTURY TECHNOLOGY (SHENZHEN) CORPORATION LIMITEDBUILDING A CENTURY SCIENCE PARK MINGQING RD LONGHUA BAOAN SHENZHEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chi, Kuo-Chieh New Taipei, TW 7 15
Liu, Chih-Chung New Taipei, TW 51 207
Liu, Jian-Xin Shenzhen, CN 7 16
Wang, Ming-Tsung New Taipei, TW 42 135

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00