Systems for converting fuel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9903584
SERIAL NO

14116636

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for converting fuel may include a first moving bed reactor, a second reactor, and a non-mechanical valve. The first moving bed reactor may include at least one tapered section and multiple injection gas ports. The multiple injection gas ports may be configured to deliver a fuel to the first moving bed reactor. The first moving bed reactor may be configured to reduce an oxygen carrying material with a fuel by defining a countercurrent flowpath for the fuel relative to the oxygen carrying material. The second reactor may communicate with the first moving bed reactor and may be operable to receive an oxygen source. The second reactor may be configured to regenerate the reduced oxygen carrying material by oxidation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OHIO STATE INNOVATION FOUNDATIONMOUNT HALL 1ST FLOOR 1050 CARMACK RD COLUMBUS OH 43210

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fan, Liang-Shih Columbus, US 64 1530
Kim, Hyung R Columbus, US 5 30
Li, Fanxing Columbus, US 27 384
Wang, Dawei Columbus, US 174 616
Wang, Fei Columbus, US 1116 10607
Zeng, Liang Columbus, US 59 333

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00