Thermosetting bamboo sand composite pressure pipe

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9903513
APP PUB NO 20160245429A1
SERIAL NO

15032264

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A thermosetting bamboo sand composite pressure pipe comprises a inner liner layer (1), an inner reinforcement layer (2), a sand adhesive layer (3), an outer reinforcement layer (4) and an outer protection layer (5) arranged respectively from an inside to an outside in a radial direction thereof. The inner reinforcement layer (2) formed by winding bamboo, a thickening layer (3) formed by stirred ore and adhesive, and the outer reinforcement layer (4) formed by winding bamboo are arranged sequentially from an inside to an outside between the inner liner layer (1) and the outer protection layer (5). The composite pressure pipe is energy-saving and environmental-friendly, raw production materials are recyclable, and a price is low.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA NATIONAL FOREST XINZHOU BAMBOO WINDING DEVELOPMENT CO LTDNO 29-16 JIAQI ROAD XIANLIN TOWN YUHANG DISTRICT ZHEJIANG HANGZHOU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yang, Huiqing Zhejiang, CN 2 8
Ye, Ling Zhejiang, CN 21 918
Zhu, Xin Zhejiang, CN 30 118

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00