Linkage to actuate inlet guide vanes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9903451
APP PUB NO 20160123347A1
SERIAL NO

14929658

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An actuation linkage assembly may include a first lever arm connected to one end of a shaft, a second lever arm connected at one end to another end of the shaft, a transition linkage connected to the other end of the second lever arm, and a bracket connected to the transition linkage. The transition linkage is configured to connect the bracket on a driver ring and to the shaft to transfer rotational motion about the axis of the shaft, from a linear motion received by an actuator, to a linear motion through the bracket causing rotational motion of the driver ring. The actuation linkage assembly is configured with high mechanical advantage. The actuation linkage assembly can be part of a movable inter-stage vane guide assembly in a compressor such as for example a centrifugal compressor, which may be part of a chiller such as in a HVAC system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRANE INTERNATIONAL INC800-E BEATY STREET DAVIDSON NC 28036

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heiden, Richard Mason Holmen, US 1 1
Johnson, Jon Christopher New Albin, US 9 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00