Substrate having electrical interconnection structures and fabrication method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9903024
SERIAL NO

14688510

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for fabricating a substrate having an electrical interconnection structure is provided, which includes the steps of: providing a substrate body having a plurality of conductive pads and first and second passivation layers sequentially formed on the substrate body and exposing the conductive pads; forming a seed layer on the second passivation layer and the conductive pads; forming a first metal layer on each of the conductive pads, wherein the first metal layer is embedded in the first and second passivation layers without being protruded from the second passivation layer; and forming on the first metal layer a second metal layer protruded from the second passivation layer. As such, when the seed layer on the second passivation layer is removed by etching using an etchant, the etchant will not erode the first metal layer, thereby preventing an undercut structure from being formed underneath the second metal layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SILICONWARE PRECISION INDUSTRIES CO LTDTAICHUNG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lu, Chun-Hung Taichung, TW 54 276
Wu, Po-Yi Taichung, TW 36 207

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00