Construction castable material with controllable flow or slump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9902650
SERIAL NO

15022389

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Construction castable material with controllable flow or slump comprising (a) a binder comprising fly ashes comprising from 1.5% to 35% by weight of CaO and a Lost on Ignition (LOI) value from 0.5% to 5.5% by weight, representing from 10% to 60% of the binder weight and ground granulated blast furnace slag comprising from 40% to 70% by weight of CaO and from 30 to 60% by weight of SiO2, representing from 40% to 90% of the binder weight, (b) an activator comprising alkaline reagents selected from the group composed by water glass, preferably in solution with 30 to 50% by weight solid content, sodium metasilicates and sodium hydroxide, (c) sand, fine and coarse aggregates and (d) organic acids or conjugated salts of organic acids in a dosage from 0.001% to 3% by weight with respect to the binder.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CEMEX RESEARCH GROUP AG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Escott, Perez Carlos Biel/Bienne, CH 1 4
Guerini, Alexander Cressier, CH 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00