Power take-off unit with locking differential

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9902262
SERIAL NO

14946074

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An all-wheel drive vehicle driveline can include an input member, first intermediate member, output member, sleeve, ring gear, and pinion gear. The input member can be coupled to an input of a differential mechanism for common rotation. The output member can be coupled to an output of the differential mechanism for common rotation. The sleeve can be axially movable between a first position wherein the input, output, and first intermediate members are rotatable relative to each other, a second position wherein the sleeve couples the input member to the first intermediate member for common rotation, and a third position wherein the sleeve couples the input member to the output member for common rotation. The ring gear can receive rotary power from the first intermediate member. The pinion gear can be meshingly engaged to the ring gear.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMERICAN AXLE & MANUFACTURING INCONE DAUCH DRIVE DETROIT MI 48211

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gorski, Robert C Clarkston, US 4 14
Kincaid, Jeffrey L Clarkston, US 26 362

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00