Conduit resonator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9902104
SERIAL NO

14860172

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for making a substantially tube-shaped conduit resonator having a plurality of plastic component parts, the conduit resonator having a tubular hollow body and at least one tubular molded part arranged inside the tubular hollow body and connected to the tubular hollow body, the method comprising the steps of: making a molded part via an injection molding process in an outer tool having an inner mandrel; injecting the hollow body between the molded part and a surrounding outer tool wherein the molded part along with the inner mandrel serve as an inner tool; and, thereafter, via a blow molding process, seating the hollow body on the inner wall of the outer tool and reshaping the hollow body on the outer wall of the molded part and bonding the hollow body, in part, to the outer wall of the molded part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CONTITECH MGW GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bavoux, Charles Koenigstein, DE 1 0
Bornemann, Axel Katlenburg-Lindau, DE 4 29
Hensel, Knut Kohren-Sahlis, DE 1 0
Schulte, Bernhard Langenberg, DE 26 267

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00