Electric screwdriver

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9902051
SERIAL NO

14663525

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a motor-driven screwdriver configured such that the upper limit value of transmittable rotational driving force differs between forward and backward rotation. The motor-driven screwdriver has a bit holder and a rotational driving force transmission device for transmitting rotational driving force to the bit holder. The rotational driving force transmission device has a driving member, a driven member having through-holes, power transmission members held in the through-holes, respectively, and an urging member urging the power transmission members inward. Each through-hole is provided such that a through-hole center axis passing through a center between a forward rotation guide surface and backward rotation guide surface of the through-hole does not intersect a rotation center axis, whereby the force with which the power transmission member is pushed radially outward is made to differ between forward and backward rotation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NITTO KOHKI CO LTDJAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hita, Hirokazu Tokyo, JP 6 24
Moriyama, Keita Tokyo, JP 9 1
Okamoto, Takayuki Tokyo, JP 62 362

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00