Table saw

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9902001
SERIAL NO

14165869

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A table saw includes a base, a work table having a cutting opening, a tank for receiving cooling liquid, a blade partly extending out from the cutting opening, and a guard assembly. The guard assembly includes a guard for covering the blade and for moving upwards under the action of a workpiece. In a working condition, at least a portion of the guard abuts against the workpiece, and the workpiece can slide relative to the guard. The guard has a guiding wall which abuts against the workpiece in the working condition and which guides the cooling liquid into a kerf in the workpiece formed by the blade. The table saw effectively controls the cooling liquid splashed during the cutting operation of the workpiece and prevents the cooling liquid from splashing to dirty the operator, the work table, and the workpiece.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANJING BOVON POWER TOOLS CO LTDNO 159 JIANGJUN ROAD JIANGNING ECONOMIC & TECHNICAL DEVELOPMENT ZONE NANJING 211106

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bernhardt, Thomas Nanjing, CN 24 241
Chai, Seow Bak Nanjing, CN 1 6
Li, Hongbo Nanjing, CN 120 326
Wu, Xin Nanjing, CN 152 1208
Zhao, Xiaoxiang Nanjing, CN 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00