Energy recovery system and method and polymerization plant with such a recovery system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9901894
SERIAL NO

14427788

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a system for energy recovery and a polymerization plant having such a system comprising a. an exothermic device operating continuously (exothermic device interpreted as any apparatus able to produce heat and transfer it onto another body), b. a cooling device in fluid communication with said exothermic device, c. an endothermic device operating discontinuously (endothermic device interpreted as any apparatus able to receive heat from another body, i.e. to be heated); said system being characterized in that it comprises a device for the accumulation of the energy produced by the exothermic device in fluid communication with the discontinuous endothermic device, the exothermic device operating continuously and the cooling device using a service fluid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VERSALIS S P APIAZZA BOLDRINI 1 20097 SAN DONATO MILANESE (MI) 20097

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fiorotto, Nicola Curtatone, IT 3 5
Gheno, Matteo San Zeno di Cassola, IT 1 5
Marchetti, Gianni Mantova, IT 3 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00