Method for the production of poly(2-octyl cyanoacrylate)-polyisobutylene co-network, and super initiators therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9901658
SERIAL NO

15302744

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for increasing the rate of polymerization of 2-octyl cyanoacrylate, or the rate of copolymerization of 2-octyl cyanoacrylate and a tri-telechelic star polymer comprising polyisobutylene terminated with cyanoacrylate groups (Ø(PIB-CA)3) to form a co-network, is provided. The method comprise initiating the polymerization of 2-octyl cyanoacrylate, or the copolymerization of 2-octyl cyanoacrylate and a tri-telechelic star polymer comprising polyisobutylene terminated with cyanoacrylate groups (Ø(PIB-CA)3) to form the co-network, with an initiator selected from the group consisting of cyclic tertiary aliphatic amines optionally dissolved in a non-aqueous solvent. The cyclic tertiary aliphatic amines are selected from the group consisting of azabicyclo[2.2.2]-octane (ABCO), and 1,4-diazabicyclo[2.2.2]-octane (DABCO).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE UNIVERSITY OF AKRON302 E BUCHTEL COMMON AKRON OH 44325

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kennedy, Joseph Akron, US 77 1342
Szanka, Amalia Budapest, HU 4 0
Szanka, Istvan Balmazujvaros, HU 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00