Method and apparatus of motion vector prediction for scalable video coding

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9900593
SERIAL NO

14013688

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Inter-layer motion mapping information may be used to enable temporal motion vector prediction (TMVP) of an enhancement layer of a bitstream. For example, a reference picture and a motion vector (MV) of an inter-layer video block may be determined. The reference picture may be determined based on a collocated base layer video block. For example, the reference picture may be a collocated inter-layer reference picture of the reference picture of the collocated base layer video block. The MV may be determined based on a MV of the collocated base layer video block. For example, the MV may be determined by determining the MV of the collocated base layer video block and scaling the MV of the collocated base layer video block according to a spatial ratio between the base layer and the enhancement layer. TMVP may be performed on the enhancement layer picture using the MV of the inter-layer video block.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • VID SCALE, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
He, Yong San Diego, US 305 3922
He, Yuwen San Diego, US 259 5534
Xiu, Xiaoyu San Diego, US 403 3440
Ye, Yan San Diego, US 658 18349

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00