Reducing switching losses in power converters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9899924
APP PUB NO 20180041125A1
SERIAL NO

15227722

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switching power converter converts power from an input source for delivery to a load at the converter output. The converter comprises at least two switches connected in series across either the input source or the output, and an inductor connected to a central node between the two switches. A controller operates the converter in a series of converter operating cycles, each operating cycle comprising an input phase, during which one of the two switches is conductive, the inductor receives energy from the input source, and a current in the inductor is increasing positively, phase. The controller is configured to adjust the duration of the input phase, and the amount of energy stored in the inductor at the end of the input phase, as a function of a an amount of energy required to charge or discharge the node capacitance during the energy recycling phase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VICOR CORPORATION25 FRONTAGE ROAD ANDOVER MA 01810

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Vinciarelli, Patrizio Boston, US 231 6307

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00