Motor structure with frame structure having bearing housing formed integrally therewith

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9899889
SERIAL NO

14656214

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A motor structure includes: a frame accommodating a stator and a rotor therein; an output-side bracket; an output-side bearing; a housing portion for supporting the output-side bearing, the housing portion being formed integrally with an output-side end of the frame and serving as a first fitting protrusion to be fitted into the output-side bracket; a flange portion formed integrally with an anti-output-side end of the frame and having an opening; an anti-output-side bearing; an anti-output-side bracket for accommodating the anti-output-side bearing therein; and a protrusion formed integrally with the anti-output-side bracket to be fitted into the opening of the flange portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANYO DENKI CO LTD33-1 MINAMIOTSUKA 3-CHOME TOSHIMA-KU TOKYO 170-8451

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horiuchi, Manabu Tokyo, JP 28 47
Miyashita, Toshihito Tokyo, JP 31 246

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00