Connector assembly and connector assembly mounted structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9899782
APP PUB NO 20170352996A1
SERIAL NO

15454565

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector assembly includes a first connector and a second connector, the first connector having a first contact and a mounting portion together with a projecting portion which passes through a through-hole of a connector holding plate to project on a side of a second face of the connector holding plate along a fitting direction when the first connector is mounted on a first face of the connector holding plate through the mounting portion, the second connector having a second contact and a second contact holding portion which has a first connector receiving portion extending along the fitting direction and an abutment portion formed at an end of the second contact holding portion on a side of the first connector and configured to be abutted against the second face of the connector holding plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JAPAN AVIATION ELECTRONICS INDUSTRY LIMITED21-2 DOGENZAKA 1-CHOME SHIBUYA-KU TOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Urano, Tetsu Tokyo, JP 24 147

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00