Terminal connection structure and method for producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9899748
SERIAL NO

15418852

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A terminal connection structure for an electric wire end portion (12a) in which the electric wire end portion is soldered being exposed on a flat-plate terminal piece (11b) out from inside of a terminal main part (11a), the terminal piece being continuous with a front end of the terminal main part (11a). The electric wire end portion (12a) exposed on the terminal piece (11b) from the terminal main part (11a) includes a first end section (12a1) that is close to the terminal main part (11a) and a second end section (12a2) that is far from the terminal main part (11a). The electric wire end portion (12a) has a shape, in side view, such that the first end section (12a1) is compressed to have a gentle curved surface that approaches the terminal piece (11b) toward the second end section (12a2).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DIAMOND&ZEBRA ELECTRIC MFG CO LTD15-27 TSUKAMOTO 1-CHOME YODOGAWA-KU OSAKA-SHI OSAKA 5320026 ?5320026

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kunimi, Takenori Osaka, JP 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00